EMBEDDED TRACK CONSTRUCTION
SPECIAL TRACKWORK CONSTRUCTION
Project Description
The KC Streetcar Riverfront Extension connects the Downtown Main Street starter-line to Kansas City's Riverfront.
The 0.7 mile extension begins at 3rd Street on Grand Boulevard in the River Market, crosses the existing Grand Boulevard Bridge, and ends near the midpoint of Berkley Riverfront.